Have you ever seen damaged or poorly cut drainage pipes? Peter Haddock goes onsite with the innovative SiteStak storage solution for underground plastic drainage to see how the product makes a difference on a Barratt Homes site in Uttoxeter. He joins the M&J Evans - Construction & Groundworks team that uses the solution to increase productivity, keep its operatives safe and maximise the quality of underground drainage installation. Fully stacked this product can hold a complete pack of drainage pipes and all of the fittings needed to install a housing site drainage system. It can be lifted from plot to plot using a telehandler or excavator with a fork attachment and even comes with a special pipe holding and cutting attachment. Its clamp (an extra pair of hands) allows pipes to be cut precisely to the exact length and chamfered using a specialist drill attachment, ensuring the best possible connection with the required fitting. This process can be seen in action in this video, which also features commentary from the team onsite.