06/11/2025Skanska USA accelerate 450 million bridge construction with 3D modelling
At the Alligator River Bridge Project in North Carolina, three huge barges, each carrying a large crane and piling rig, are supporting the construction of the new 3.2 mile long bridge using 3D machine control from Leica Geosystems.
16/09/2025Massive floating piling rig in the USA perfectly positioned with 3D Machine Control
Massive floating piling rig in the USA perfectley positioned with 3D Machine Control
06/06/2024The Power of Where the construction industry and clients want location based data
‘The Power of Where’ - construction industry clients now want location-based data, with National Highways alone equating the value of its data at £80bn, says Mark Lawton Head of Engineering Survey at Tier 1 contractor Skanska.
14/11/2019Mark Lawton of Skanska on Highways England Raising the Bar with 3D Machine Control
Peter Haddock interviews Mark Lawton from Skanska about the importance of the new Highways England 'Raising the Bar' document, which mandates 3D machine control on its projects.


